My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'� <br />r <br />3.03 SCHEDULES <br />CONTRACTOR shall notify MANAGER at least forty -eight (48) hours before each concrete placement. <br />3.04 FIELD QUALITY CONTROL <br />A. Concrete testing will be performed by CONTRACTOR. <br />B. Four standard 6 -inch diameter by 12 -inch long test cylinders shall be prepared for every 50 yards of <br />concrete placed or one per day, whichever is greater, at the discretion of the MANAGER, DESIGN <br />ENGINEER, and CERTIFYING ENGINEER. <br />C. Standard compression tests shall be performed to determine the compressive strength: one at seven <br />(7) days, one at fourteen (14) days, and one at twenty -eight (28) days. The fourth cylinder shall be <br />kept in reserve for additional testing, if necessary. <br />D. Slump testing shall be performed at the time the cylinders are prepared. <br />* ** END OF SECTION * ** <br />Section 03320 <br />Concrete Plug <br />SAProjects \1125E CCV C0A \I - Tech Specs \03320.r1.doc <br />Page 3 of 3 <br />September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.