My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2: PRODUCTS <br />2.01 MATERIALS <br />A. Portland Cement, ASTM C 150, Type V. <br />B. Coarse Aggregate, ASTM C 33, except that clay and shale particles shall not exceed 1 percent of total <br />aggregate. <br />C. Fine Aggregate, ASTM C 33, washed natural sand. <br />2.02 MIXES <br />A. Mix Designs: <br />Concrete mix design shall be designed by an independent testing laboratory. <br />B. Cast -In -Place Concrete: <br />1. Cast -in -place concrete shall have a minimum 28 -day compressive strength of 4,000 psi. <br />2. Maximum Aggregate size of 1 -inch. <br />3. Placement slump of between 2- inches and 5- inches. <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. Ready -Mix Concrete shall be batched, transported, and placed in accordance with ASTM C 94. Each <br />batch delivered to the Site shall be accompanied by a certified weight master's delivery ticket. <br />B. All mixed concrete delivered to the Site shall be placed within 90 minutes from the time of <br />introduction of cement and water into the mix. <br />C. No water shall be added after leaving the batch plant without the approval of CERTIFYING <br />ENGINEER. <br />D. Placement of concrete, once started, shall be performed as a continuous operation until the scheduled <br />placement is completed. <br />E. Cold joints shall be approved by CERTIFYING ENGINEER. <br />F. Vibrators shall be used only to minimize honeycomb, and shall not be used to move concrete from <br />one location to another. Concrete shall not be moved in the forms more than 5 feet. <br />G. The rock surface within the competent bedrock of the underground working shall be scaled to <br />removed any loose material prior to Cement Plug placement. <br />3.02 CLEANING <br />All form materials and debris resulting from construction shall be disposed of as directed by MANAGER. <br />Section 03320 Page 2 of 3 September 3, 2008 <br />Concrete Plug Revision 1 <br />SAProlects \1125E CCV CQA \I - Tech Specs \03320.rt.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.