My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 WASTE REMOVAL: <br />Waste material is defined as material too wet, too dry, frozen or containing ice or snow, containing organic or <br />other deleterious matter, having poor characteristics of grading or compaction, having other characteristics that <br />may result in undesirable settlement or other movement of the fill, or within the fill, or otherwise not meeting <br />the requirements of the SPECIFICATIONS, provided that this definition permits drying, water, and any other <br />processing or reprocessing to make the material stable and suitable prior to incorporating it into the fill as <br />permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER. <br />A. CONTRACTOR shall excavate and remove waste in a manner that will minimize contamination <br />with other soil horizons. <br />B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER. <br />3.04 EXCAVATION: <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS or as <br />directed by MANAGER. No excavation shall begin until the CONTRACTOR has provided <br />construction staking for the proposed work. <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. Where <br />selective excavations are required to obtain materials for Structural Fill and Select Structural Fill, the <br />material removed from the excavations shall be taken directly to the fill areas or, if required, <br />stockpiled by material types. The stockpiles shall be approved by MANAGER. <br />C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide adequate <br />drainage at all times. Work shall be suspended by CONTRACTOR when, in the opinion of <br />MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or otherwise <br />unsuitable for proper maintenance, until directed otherwise by MANAGER, at no cost to CC &V. <br />D. In excavations where Structural Fill or Select Structural Fill is to be placed on slopes steeper than <br />3H: IV, horizontal benches shall be excavated into the slope to allow fill to be placed in horizontal <br />lifts. The CONTRACTOR shall continuously bench and key embankment material into the existing <br />material a minimum of 2 feet. <br />E. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open -cut excavations on a regular basis <br />for signs of instability. Should signs of instability be noted, CONTRACTOR shall immediately <br />undertake remedial measures and shall notify MANAGER immediately. Permanent cut slopes shall <br />be left in smooth, safe, and stable condition at the end of the workday. <br />F. CONTRACTOR shall final grade excavations within the valley leach facility to establish positive <br />drainage to the Pregnant Solution Storage Area. In no case will depressions or bowls be permitted in <br />the valley leach facility area. <br />G. CONTRACTOR shall conduct all excavation and shoring operations in compliance with applicable <br />MSHA, Colorado State and Federal government laws and regulations. <br />3.05 SUBGRADE: <br />A. The MANAGER and CERTIFYING ENGINEER will inspect and approve the exposed subgrade <br />prior to any fill or Soil Liner being placed. CQA Monitor will confirm that the surface of the <br />Section 02200 Page 6 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \02200.rt.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.