My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -35- 043 -2170 <br />• <br />6.2 Leak Detection Trencli and Underdrain Geosynthetics <br />Conformance testing for 40 -mil smooth LLDPE geomembrane used to construct the LDTs is <br />presented in Appendix K -1. The inventory control log for LDT geomembrane is presented in <br />Appendix J -1. Conformance testing for the 40 -mil LLDPE used for Phase We OSA construction met <br />specifications. Geomembrane in the LDTs was extrusion welded. Golder monitored trial seams, as <br />described in Section 6.1.3.1. <br />Twelve -ouncc non -woven geotextile was placed in the LDTs and UDs. Geotextile in LDTs and UDs <br />was placed with a minimum overlap of 1 foot. Geotextile quality control certificates are presented in <br />Appendix J -6. <br />6.3 Underground Workings Geosyntbetics <br />Quality Control certifications provided for the geogrid is presented in Appendix L -1. Conformance <br />testing results performed on geogrid used in the remediation of the underground workings within the <br />footprint of the OSA are presented in Appendix L -2. Golder monitored geogrid installation, <br />including construction of proper connections by use of bodkin bars. Conformance testing for geogrid <br />used for Phase IVc OSA construction met specifications. <br />• <br />L• to+ u190101OO1Cc sY- QAPEIVc- 1OP11WS170.a00. 124MC -Vh Va000 Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.