Laserfiche WebLink
October 2004 -16- 043 -2170 <br />part of the Prase We OSA. Record Drawing. No. 5 in Appendix A presents the OSA geomembrane <br />panel layout. Ames anchored geomembrane at the limits of the Phase We OSA in an anchor trench <br />with minimum dimensions of 3 feet deep by 2 feet wide. The geomembrane tie -in panels overlapped <br />the Phase 1Vb geomembrane panels a minimum of 3 feet and were extrusion welded, as shown in TFC <br />Drawin 17, Detail 3. <br />3.4 Underground Workings <br />A summary of underground working remediation for the Phase We OSA is presented in Table 3. <br />Additional remediation details are presented in Section 4.2.1. <br />• <br />Golder Associates <br />