My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Octobe 2004 -S- 043 -2170 <br />• Water Trucks (2); <br />is • Caterpillar 14G Motor - Grader; <br />• Caterpillar CS563 Smooth Drum Vibratory Roller (SDVR) Compactors (2); <br />• Caterpillar 120 Trackhoe; <br />• Caterpillar 314 Trackhoe; <br />• Caterpillar 375 Trackhoe; <br />• Caterpillar 740 Haul Trucks (6); and <br />• Caterpillar D400E Haul Trucks (2). <br />Weather data from the period of September 2001 through August 2002 are presented in the 2002 <br />Phase IVa Certification Report, weather data from the period of September 2002 through June 2003 <br />are presented in the June 2003 Phase IVb PSSA Certification Report, and weather data from the <br />period of June 2003 through October 2003 are presented in the October 2003 Phase IV b OSA <br />Certification Report. Table 2 presents a summary of the weather during the period of April 2004 <br />through October 2004 for the Phase 1Vc OSA construction activities. <br />0 2.1 Underground Workings Remediation <br />Historic underground workings within the footprint of the Phase 1Ve OSA were remediated following <br />the recommended remediation plans presented in Drawing No. 12 of the IFC Drawings or by the <br />Certifying Engineer, with DMG approval. <br />A summary of the underground workings remediation is presented in Table 3. This table shows the <br />working identification, location (northing and easting), type of working, remediation quantities, and <br />comments. The following provides a summary of the general remediation methods for the <br />underground workings within the Phase We OSA footprint. <br />2.1.1 Remediation of Shafts, Stopes, and Shallow Surface Pits <br />The following is the general approach used to remediate isolated shafts and shallow surface pits: <br />• For open workings where the depth to competent bedrock is less than 7 feet to the <br />• final SLF subgrade surface, the excavations were backfilled with CSB to <br />MU17 004MCC" -()4eervt- 1004w4n»0.0400.124sac.Mrtrv�a« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.