Laserfiche WebLink
August 2002 -iv- 003 -2203 <br />Drawing 10a Phase TVa High Volume Solution Collection Piping Layout Sheet 1 of 1 <br />Drawing 11 Phase IV Valley Leach Facility Cross Sections <br />Drawing 12 Phase TV Underground Working Remediation Details <br />Drawing 13 Phase 1V Underdrain Details <br />Drawing 14 Phase IV Leak Detection and Erosion Control Details <br />Drawing 15 Phase IV Surface Water Diversion Details Sheet 1 of 2 <br />Drawing 16 Phase IV Surface Water Diversion Details Sheet 2 of 2 <br />Drawing 17 Phase IV VLF Sections and Details <br />Drawing 29 Bateman Creek Pond Design and Sections <br />LIST OF APPENDICES <br />Appendix A Record (As-built) Drawings <br />Record Drawing No. 1 General Composite Overview <br />Record Drawing No. 2 Primary and Secondary Underdrain As -built <br />Record Drawing No. 3 Top of Soil Liner Fill As -built <br />Record Drawing No. 4 Leak Detection Trench As -built <br />Record Drawing No. 5 Geomembrane Record Drawing: Ore Storage Area <br />Appendix B Photographic Documentation <br />Appendix B -1 Photograph Log <br />Appendix B -2 Documentary Photographs <br />Appendix C Staff Schedule for Golder Personnel <br />Appendix D Weekly Reports <br />Appendix E Specifications <br />Appendix F Surveyor's Certificate <br />Appendix G Subgrade Acceptance Forms <br />Appendix H Concrete Observation and Testing Results <br />Appendix I CQA Laboratory Test Results <br />Appendix I -1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix I -2 Compaction Tests <br />Appendix 1 -3 Soil Liner Fill Permeability Tests <br />Appendix J Geomembrane Quality Control Documents and Inventory <br />Appendix J -1 Geomembrane Inventory Control <br />Appendix J -2 Resumes of Installation Personnel <br />Appendix J -3 Geomembrane Resin Quality Control Certificates <br />Appendix J -4 Geomembrane Roll Quality Control Certificates <br />Appendix J -5 Welding Rod Quality Control Certificates <br />Appendix J -6 Geotextile Roll Quality Control Certificates <br />Appendix K Geomembrane Installation Observations <br />Appendix K -1 Conformance Test Results <br />Appendix K -2 OSA Deployment Observations <br />Appendix K -3 OSA Trial Seam Summaries <br />Appendix K -4 Tensiometer Certification <br />I10= 07WOMCetRgMO2WM2203 .0400.04740on.d« Golder Associates <br />