Laserfiche WebLink
Figure 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGS` <br />Drawing 2a Phase IVa Existing Valley Leach Facility Site Conditions Sheet 1 of 1 <br />Drawing 3 Site Geology Map <br />Drawing 4 Site Grading General Plan <br />Drawing 5a Phase IVa Site Grading Plan Sheet 1 of 1 <br />Drawing 6a Phase 1Va Known Underground Workings and Surface Reconnaissance <br />Sheet 1 of 1 <br />Drawing 7a Phase IVa Remediation Areas and Cut/Fill Isopach Sheet 1 of 1 <br />Drawing 8b Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 2 of 4 <br />Drawing 8c Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 3 of 4 <br />Drawing 8d Phase IV Permanent Surface Waxer Diversion Plan and Profile Sheet 4 of 4 <br />Drawing 9a Phase 1Va Site Survey Control Plaza <br />• - Only drawings relevant to Phase IVa construction are presented. <br />[ -\00\*=\D400A S0:,O322o3.04M.04740M.d� Golder Associates <br />August 2002 <br />-iii- 003 -2203 <br />LIST OF TABLES <br />• <br />Table 1 <br />Summary f Earthworks Material Specifications <br />�Y P <br />Table 2 <br />Summary of Weather Data <br />Table 3 <br />Underground Remediation Summary — Phase IVa Underground Workings <br />Table 4 <br />Earthworks CQA Test Summary and Testing Frequency <br />Table 5 <br />CQA Laboratory Test Summary, Underdrain Fill <br />Table 6 <br />CQA Laboratory Test Summary, Select Structural Fill <br />Table 7 <br />CQA Laboratory Test Summary, Leak Detection Fill <br />Table 8 <br />CQA Laboratory Test Summary, Structural Fill <br />Table 9 <br />CQA Laboratory Test Summary, Soil Liner Fill <br />Table 10 <br />CQA Laboratory Test Summary, Drain Cover Fill <br />Table 11 <br />CQA Laboratory Test Summary, Fine Shaft Backfill <br />Table 12 <br />CQA Laboratory Test Summary, Pipe Bedding Material <br />Table 13 <br />Field Density and Moisture Content Test Summary, Soil Liner Fill <br />Table 14 <br />Soil Liner Fill Depth Verification Summary <br />Table 15 <br />CQA Laboratory Test Summary, Concrete <br />Table 16 <br />Field Density and Moisture Content Test Summary, Structural Fill <br />Table 17 <br />Field Density and Moisture Content Test Summary, Pipe Bedding Fill <br />Table 18 <br />CQA Laboratory Test Summary, Granular Filter Material <br />LIST OF FIGURES <br />Figure 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGS` <br />Drawing 2a Phase IVa Existing Valley Leach Facility Site Conditions Sheet 1 of 1 <br />Drawing 3 Site Geology Map <br />Drawing 4 Site Grading General Plan <br />Drawing 5a Phase IVa Site Grading Plan Sheet 1 of 1 <br />Drawing 6a Phase 1Va Known Underground Workings and Surface Reconnaissance <br />Sheet 1 of 1 <br />Drawing 7a Phase IVa Remediation Areas and Cut/Fill Isopach Sheet 1 of 1 <br />Drawing 8b Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 2 of 4 <br />Drawing 8c Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 3 of 4 <br />Drawing 8d Phase IV Permanent Surface Waxer Diversion Plan and Profile Sheet 4 of 4 <br />Drawing 9a Phase 1Va Site Survey Control Plaza <br />• - Only drawings relevant to Phase IVa construction are presented. <br />[ -\00\*=\D400A S0:,O322o3.04M.04740M.d� Golder Associates <br />