Laserfiche WebLink
August 2002 -32- 003 -2203 <br />5.0 OEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by Golder included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, welding rod certificates, geogrid <br />certificates, and geotextile certificates. Golder's inventory control, summarizing CQC <br />certification received for each roll of geomembrane received for the Phase IV composite liner <br />system, is presented in Appendix J -1. All geosynthetic material used as part of the Phase Na <br />construction met project specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />Golder reviewed the resumes of Poly -Flex installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by the <br />project specifications. Review of the installation personnel resumes indicated that key <br />personnel had experience sufficient to meet or exceed project specifications. Geomembrane <br />• personnel resumes are presented in Appendix J -2. <br />5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly -Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. <br />Golder reviewed CQC documents prior to geomembrane placement and verified that the <br />documentation was complete and that the material properties and CQC testing frequency <br />required by specifications were met. <br />5.2.1 Resin CQC Certificates <br />LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail car shipment. Golder <br />• reviewed these certificates prior to geomembrane placement. The geomembrane manufacturer <br />AoM2W.04=CcnR Golder Associates <br />