My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. A, Phase IVa and IVc Certification Documentation
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 4- 003 -2203 <br />1.2.2 CQA/CQC Monitoring of Geosynthetics Installation <br />• <br />Golder provided CQA monitoring of geosynthetics used for the Phase Na Area. CQC services <br />provided by Golder consisted of performing geosynthetics inventory and checking quality <br />control certifications prior to geosynthetics deployment. Golder performed geosynthetics CQA <br />activities in accordance with the CQA Plan. Geosynthetics CQA activities performed included: <br />► Golder observed and documented geomembrane deployment, trial seams, <br />seaming, destructive testing, and non - destructive testing (pressure tests <br />and vacuum tests); <br />► Golder performed conformance testing of geomembrane; <br />► Golder measured geomembrane panel thickness and confirmed adequate <br />panel overlap; <br />► Golder visually inspected geomembrane sheet quality, sheet grinding, <br />seam aligmnent, and continuity; and, <br />► Golder retained archive samples of geomembrane destructive tests and <br />trial seams. <br />1.3 Project Coordination <br />All Golder CQC and CQA activities were directed by Mr. Robert Nichols, the Golder Resident <br />Engineer. The Certifying Engineer, Mr. John F. Lupo, Ph.D., P.E. or his representatives <br />(Mr. Greg Eddy, P.E., Project Engineer, and Mr. James M. Johnson, Principal) made periodic <br />site visits to resolve technical issues and to review Golder activities. Appendix C presents a <br />summary of the Golder staff on -site during the period of February 2001 through August 2002. <br />Representatives of CC &V, Ames, Poly -Flex, and Golder conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />• <br />tW 01220 ]NQ40OW -dR*08aZW03M304M04740M&K Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.