Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ��� <br />. Quality Assurance Monitoring and Test Results <br />Liner Recertification <br />December 17, 2009 <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Certifying Engineer and as the Quality Assurance <br />Consultant for the recertification of the Phase IVa ramp and Phase IVc LOB, and per the <br />requirements of the various applicable DRMS approvals, AMEC Earth and Environmental <br />(AMEC) attests that it observed and performed the required CQA activities for this project. <br />Based on daily communications with AMEC personnel, observations made during on -site visits, <br />and review of the laboratory and field test results, AMEC attests that the Phase IVa ramp and <br />the Phase IVc LOB were constructed in compliance with specifications as described in this <br />document. <br />• <br />�� ° Q�Q I R EC/ / ���s� 'f <br />S: \PROJECTS\7125E CCV CQA \H2 - DESIGN\LINER RECERTIFICATION REPORT\REPORT BODY\QA MONTIORING AND TEST RESULTS LINER <br />RECERTIFICATION.DOC - 22 <br />