Laserfiche WebLink
• BOWIE RESOURCES LIMITED <br />Permit No. 83DL062-1 F <br />Initial Approval <br />Page 5 <br />13. Prevention of Significant Deterioration (PSD) requirements shall apply to this source at any such <br />time that this source becomes major solely by virtue of a relaxation in any permit condition. Any <br />relaxation that increases the potential to emit above the applicable PSD threshold will require a full <br />PSD review of the source as though construction had not yet commenced on the source. The <br />source shall not exceed the PSD threshold until a PSD permit is granted. (Reference: Reg.3, Part <br />B, IV.D.3.b.(ivl) <br />~~~`~~~ <br />R K Hancock III Dennis Myers P.E <br />Permit Reviewer Unit Leader <br />IssuaE: Initlai Approval BausE September 12, 1983 <br />Final Approval iasue0 MaY 30. 1985 <br />Trenafx of Ovmenitip'satl April 6, 1991 <br />Traru/ar o/ Ovmenbip: from Colorsoo WastrtradarM. Iro. <br />Trans/u of Ovmerebip 2: from Cyprus OrcharE Ve14y Coal Corpwatbn. <br />Maeflkatlon: aptlin9 short term procmeip rrret. irlcrees+q annual procsstirq Imit from 100,000 tons per year, Woinq bwra of operation limb, reiswe <br />u InHlal Approval. <br />Notes to Permit Holder: <br />• 1). The production or raw material processing limits and emission limits contained in this permit are <br />based on the production/processing rates requested in the permit application. These limits may be <br />revised upon request of the permittee providing there is no exceedence of any specific emission <br />control regulation or any ambient air quality standard. A revised air pollution emission notice <br />(APEN) and application form must be submitted with a request for a permit revision. <br />2). This source is subject to the Common Provisions Regulation Part II, Subpart E, Upset Conditions <br />and Breakdowns. The permittee shall notify the Division of any upset condition which causes a <br />violation of any emission limit or limits stated in this permit as soon as possible, but no later than <br />two (2) hours after the start of the neM working day, followed by written notice to the Divisior <br />explaining the cause of the occurrence and that proper action has been or is being taken to correct <br />the conditions causing said violation and to prevent such excess emission in the future. <br />3). In accordance with C.R.S. 25-7-114.1, the Air Pollutant Emission Notice (APEN) associated with <br />this permit is valid for a term of five years. The five year term for the APEN received with this <br />permit application expires on December 30, 1999. A revised APEN shall be submitted no later than <br />30 days before the five year term expires. <br />4). This source is classified as a: Synthetic minor source for Operating permit and Prevention <br />of Significant Deterioration (PSD) applicability <br />At a : Synthetic Minor Facility <br />I• <br />29/8/7 <br />