Laserfiche WebLink
§2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />ACTIVITIES -- MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION <br />PLANS. <br />(4) Requirements for rock-toe buttresses or key-way cuts. <br />(1) Test pits and borings. <br />Not applicable. <br />(2) Engineering specifications. <br />Not applicable. <br />(7) Coal Handling Facilities. <br />A narrative of the coal handling facilities are presented in 2.O5.3(3)(b). The <br />following coal handling structures are discussed. <br />1. Railroad Spur <br />2. Truck Scales <br />3. Truck Dump <br />4. Silo Elevating Conveyor <br />5. Coal Storage Silos (3) <br />6. Train Loadout elevating conveyor <br />7. Train Loadout <br />(8) Coal Processing Waste and Non-Coal Processing Waste. <br />The train loadout and stockpile area neither receives nor produces coal <br />processing waste. The requirements of this section are not applicable to the <br />train loadout and stockpile permit area. Coal processing waste generated by <br />the Bowie No. 2 Mine and its disposal and handling are discussed in Volume I - <br />Text, Section 2.05.3(8). <br />TR-020 <br />2.05 - 21 <br />3/01 <br />