Laserfiche WebLink
SECTION 2 05 OPERATION AND RECLAMATION PLAN <br />2.05.1 Objectives <br />Oakridge's objective for the current Section 2.05 is to relate the historical plan of operations and <br />the reclamation plan as executed in 2006. Remaining reclamation obligations include monitoring <br />and maintenance of the sediment control system and reclamation, and removal of remaining heavy <br />equipment. <br />I] <br />• <br />Abridged Permit Document 5 -1 Feb 2008 <br />