Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER - nMI Y WnRK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task #: 014 State : Co <br />Date : 0512112008 County La Plata <br />User: TAK Site Carbon Junction Mine <br />Permit or other job action : RN -03 <br />32.00 <br />LCY <br />Heaped volume: <br />Task description Haul topsoil from topsoil stockpile 2 to North Pit haul road <br />LCY <br />Average volume: <br />_. <br />HOURLY EQUIPMENT COST <br />_.. _ _ _ _.... _. _._. <br />-- <br />...._ <br />Model: <br />Cat 657E w /push pull <br />Shift basis <br />: 1 per day <br />Maneuver and spreading time : <br />Cost Breakdown : <br />Job utilization % <br />Horsepower <br />: 1045 <br />Ownership cost/hour: <br />$132.14 NA <br />Weight (UST) <br />: 80.07 <br />Operating cost/hour <br />: $205.26 100 <br />Cost data source <br />: (CRG) <br />Operator cost/hour <br />: $24.95 NA <br />Total unit cost/hour <br />: $362.35 Total fleet cost/hour: <br />$724.71 <br />..............................................................................:.....:....:.:.:::.:.:.::::::.::::::::::.:::::::::::::::::::::::::::::::::.::.: <br />::::::............................................................................................................................................................. <br />MATERIAL QUANTITI <br />Q S <br />::::.::.::::::::::::::::::::::. <br />............................... <br />Initial <br />Swell Loose <br />volume: 3,000 BCY <br />factor : 1.4 29 volume: <br />4,286 <br />LCY <br />Source of quantity take -off : Cost estimate in TR -12 <br />Source of estimated swell factor DRMS estimate <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis <br />Material weight: 1,600 pounds /LCY <br />Material description <br />Top Soil <br />Rated payload : 104,000 pounds <br />Payload capacity: 65.00 LCY <br />Cycle Time (load + haul + spread + return) : <br />Travel time: <br />Scraper Bowl (volume) Basis <br />Struck volume : <br />32.00 <br />LCY <br />Heaped volume: <br />44.00 <br />LCY <br />Average volume: <br />38.00 <br />LCY <br />Adjusted capacity : <br />38.00 <br />LCY * ** <br />Loading time : <br />1.10 <br />minutes <br />Maneuver and spreading time : <br />0.60 <br />minutes <br />* loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />1,553.03 <br />Haul: <br />1,100 <br />2.7 <br />5.0 <br />7.7 <br />1,426 <br />0.87 <br />Iminutes ** <br />Return : <br />1,100 <br />-2.7 <br />5.0 <br />2.3 <br />3,023 <br />0.36 <br />Iminutes ** <br />travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Job Condition Correction Factors : <br />Site altitude (feet) : 7,000 <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shiffiday) <br />Net job correction factor : 0.83 <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) <br />Unit cost: $0.562 /LCY <br />Total cycle time : <br />2.94 <br />minutes <br />Adjusted Hourly Production ; <br />Unadjusted unit production : <br />1,553.03 <br />LCY /Hour * ** <br />Adjusted unit production : <br />1,289.02 <br />LCY /Hour <br />Adjusted fleet production : <br />1,289.02 <br />LCY /Hour <br />2 times volume on push -pull models <br />Total job time : <br />3.32 <br />Hours <br />Total job cost : $ 2,409 <br />Permit/job # C -92 -080 <br />Abbreviation : none <br />Filename : C080 -014 <br />