My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_PERMIT FILE - C1992080
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080
>
2008-08-11_PERMIT FILE - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:22 PM
Creation date
12/29/2009 8:43:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Permit File
Doc Date
8/11/2008
Doc Name
Cost Estimate
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task #: 013 State Colorado Permit/job #: C-92-080 <br />Dote : 0512112008 <br />User: 7A K <br />Abbreviation :none <br />County: LaPlata <br />Site Carbon Junction Mine <br />Agency or organization name: CDRMS <br />Task description: Grade North Pit haul road fill <br />xx <br />Basic machine :OATY4H Horsepower: 215 <br />Attachment no. 1 : NA <br />Attachment no. 2 : Multi-shank ripper <br />MATERIAL QUANTITIES <br />Permit or other job action : RN-03 <br />Total area to be graded or ripped : 9.24 acres <br />Shift basis: Y per day <br />Data source : (CRG) <br />Width of blade overlap per pass <br />� <br />Net grading or ripping width per pass <br />� <br />Unadjusted hourly unit production <br />� <br />Job Condition Correction Factors <br />Average site altitude : 7,000 <br />209 feet <br />/Ll/O h»a °° ~width m ripper beam nn ripping applications <br />1.5303 acres/hour <br />Source <br />feet Altitude adjustment factor <br />Job efficiency adjustment factor: <br />Net job correction : 0.9000 multiplier <br />Adjusted hourly unit pnoduction: 1.3773 acres/hour <br />Adjusted hourly fleet production 1.3773 acres/hour <br />JOB TIME AND COST <br />Fleet size : i grader(s) Tot job time : 6.71 hours <br />Unit cost: $8435 per acre Total �obcoo � $779 <br />
The URL can be used to link to this page
Your browser does not support the video tag.