<br />The mining site locations are specified in Table 2 below:
<br />Table 2
<br />Page 2
<br />_ T 7
<br />Site Name
<br />Location
<br />WDID
<br />Teti Pit
<br />Sections 19 and 20, T2S, R67W
<br />0203027
<br />North Dahlia Pit
<br />Sections 19 and 20, T2S, R67W
<br />0203028
<br />Jeronimus Pit
<br />Section 16, T2S, R67W
<br />0203029
<br />Hazeltine Pit
<br />Section 9, T2S, R67W
<br />0203030
<br />Brighton Pit
<br />Sections 14 and 23, T1 S, R67W
<br />0203031
<br />Tucson South Pit
<br />Sections 1 and 12, T1 S, R67W
<br />0203032
<br />Tucson Pit
<br />Section 1, T1S, R67W
<br />0203033
<br />Wattenberg Pit
<br />Sections 25 and 36, TIN, R67W; Section 30, T1 N, R66W
<br />0203034
<br />Platte Valley Pit
<br />Section 30, T1 N, R66W
<br />0203035
<br />Distel Pit
<br />Sections 7, 8, 9, 17 and 18, T2N, R68W
<br />0503000
<br />Tull Pit
<br />Sections 9, 16 and 17, T2N, R68W
<br />0603001
<br />W.W. Farms Pit
<br />Sections 32 and 33, T6N, R66W
<br />0303014
<br />F- Street Pit
<br />Sections 34 and 35, T6N, R66W
<br />0303015
<br />East 8th Street Pit
<br />Sections 4 and 9, T5N, R65W
<br />0303016
<br />The required fee of $3598 (14 sites x $257 /site renewal fee) has been submitted.
<br />Aggregate previously operated Stegner Pit (M -99 -021) under the combined SWSP. The
<br />State Engineer approved the clay liner for the Stegner Pit, which eliminated the need to replace
<br />new depletions from the evaporation of exposed ground water. Because there are no longer lagged
<br />depletions that affect the stream from the previously mined site at Stegner Pit, you did not include
<br />this site in the SWSP.
<br />Aggregate anticipates to actively mine four sites in 2010: W. W. Farms Pit, Distel Pit,
<br />Hazeltine Pit, and Brighton Pit. Depletions resulting from evaporation and mining operations at
<br />these sites are replaced under this plan. Water use at the W.W. Farms during the period of this
<br />plan will include dewatering, evaporation from exposed groundwater, aggregate production, dust
<br />control and concrete batching. The dewatering rate is anticipated to remain at 450 gallons per
<br />minute in 2010. The exposed surface area at the W.W. Farms Pit has been updated based on
<br />recent aerial photo. As mentioned in the previous SWSP approval Aggregate applied to DRMS to
<br />amend the existing area boundary of the W.W. Farms to include the W.W. Farms Expansion area.
<br />Water use at the Distel Pit, Hazeltine Pit and Brighton Pit in 2010 will include dewatering,
<br />evaporation from exposed groundwater, aggregate production, and dust control. The average
<br />dewatering rate is anticipated to remain at 1,100 gallons per minute (Distel Pit) and at 900 gallons
<br />per minute (Hazeltine Pit) in 2010. The dewatering at the Hazeltine Pit will result in a net accretion
<br />to the river and the dewatering at the Brighton Pit is assumed to offset the post - pumping depletions
<br />from dewatering at the Platte Valley Pit. The exposed surface area at the Distel Pit has been
<br />updated based on recent cross - section drawing performed for the Distel Pit well permit submitted
<br />on August 20, 2009. The exposed surface area at the Hazeltine Pit and Brighton Pit will remain at
<br />2.3 acres and 30.7 acres respectively.
<br />Aggregate also has eight sites with exposed surface area that will not be mined in 2010: