My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-17_INSPECTION - M1981185
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981185
>
2009-12-17_INSPECTION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:47 PM
Creation date
12/24/2009 8:11:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
INSPECTION
Doc Date
12/17/2009
Doc Name
Insp Rpt
From
DRMS
To
Wildcat Mining Corporation
Inspection Date
11/24/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date: <br />07- Dec -2009 Permit or job no.: M-1981 -185 <br />Site <br />May Day Mine <br />User: <br />WHE Abbreviation : none <br />State :Colorado <br />Filename: M185 -000 <br />County:La <br />Plata <br />Agency or organization name : <br />_ <br />$116.322 <br />Permit or job action : Routine bond update <br />TOTAL DIRECT COST -= <br />$116,322 <br />INDIRECT COSTS <br />TASK <br />LIST (DIRECT COSTS) <br />FORM <br />FLEET <br />TASK <br />DIRECT <br />NO . <br />TASK DESCRIPTION <br />USED <br />SIZE <br />HOURS <br />COST <br />81.47 <br />hrs' ... $!hc $5210 total= <br />$4,245 <br />Profit: <br />10.00 <br />%of direct total= <br />001 <br />- Demolish an r em ov e mine related structures <br />demolish <br />1 <br />80 .00 <br />$25,510 <br />Ole <br />_ <br />-Dum fee at l /ill f items removed under Ta sk_ 001 <br />_ <br />{ _ de m olis h <br />1 <br />1.00 <br />$65,390 <br />002 <br />-Clos f ourport als <br />mines <br />1 <br />40.00 <br />$14,224 <br />003 <br />_ <br />-Walk e xcav at or tram C R 1 to Leve13 (Lamb) portal <br />�_ NA <br />1 <br />NA' <br />$108 <br />004 <br />_ <br />- Highw reducti at Level 3 (Lamb) porta <br />excavate <br />1 <br />_0 <br />1.0 <br />$116 <br />005 <br />- Co ntour Of at Leve1 install terrace an stormwater berm <br />excavate <br />_ <br />1 <br />_ 1.0 <br />_ $118 <br />006 <br />Walk exc avator from Level 3 to Level 1 <br />NA _ <br />1 <br />1.0 <br />$108 <br />007 <br />- High reduct at Lev el ? (active) portal <br />ex <br />_ <br />1 <br />4.8 <br />_$ <br />0 06 <br />009 <br />- Conto u r du at Level 1, Install ter and stormwater berms <br />!-Walk e fr Level 1 to Level 2 a rea (lowest level) <br />excavate <br />NA <br />1 <br />1 <br />2.8 <br />_ 0.2 <br />_ __$307 <br />_ $27 <br />010 <br />�-Highwall r educ t ion at Lev ar <br />excavate <br />1 <br />2. 4 <br />$264 <br />excavate <br />1 <br />011 - Contour du mp al Lev $ install t and sto <br />2.8 <br />$307 <br />012 <br />-_Walk ex cav a tor f ro m L 2 area to CR 124 <br />NA <br />7 <br />0.5 <br />_ <br />$54 <br />reP age <br />1 <br />20.00 <br />4.06 <br />013 <br />014 <br />- Revegetale aHecte <br />_Haul reclamation equipment to and from job site <br />—t <br />_ $7,722 <br />$1,538 <br />mobilize <br />8 <br />TOTAL BOND AMOUNT (direct + indirect) = $ 148,329 <br />SUerOTALS;_1 <br />$116.322 <br />• includes mflauon laclor dil lmenl of NA % <br />TOTAL DIRECT COST -= <br />$116,322 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability insurance: <br />2 <br />%of direct total= <br />$2,350 <br />_ <br />Performance bond: <br />7.05 <br />%of direct total= <br />$1,22 <br />Job superintendents <br />81.47 <br />hrs' ... $!hc $5210 total= <br />$4,245 <br />Profit: <br />10.00 <br />%of direct total= <br />$11,632 <br />'assume her hours= 50 %o /re6k hours <br />TOTAL 08 P= <br />$19,448 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT- <br />CONTRACT AMOUNT jail +08 P)= <br />$135,770 <br />Financial warranty processing (legal /related costs) : <br />OAO <br />total $ NA total = <br />$0. <br />Engineering work and /or contractlbid preparation: <br />4.25 <br />%of cold. NA fatal= <br />$ 5,770 <br />Reclam management an ad min istr ation : <br />5.00 <br />% of c_ ntr. NA total = <br />$6,789 <br />C ONTINGENCY- <br />NA' <br />NA total= <br />NA <br />contlngencrea soeounleiforal task level <br />TOTAL INDIRECT COST= <br />$32,007 <br />TOTAL BOND AMOUNT (direct + indirect) = $ 148,329 <br />
The URL can be used to link to this page
Your browser does not support the video tag.