Laserfiche WebLink
EXHIBIT E 3 of 3 <br />► � f <br />7040 W. Hwy- 166 M mom Oo. 611W (71%58946' <br />(i). Reclamation of each phase is expected to be a continual process once <br />the initial 3 acres is disturbed. <br />(ii). The size of Phase I reclamation will be 19.57 acres, Phase II <br />will be 35.92 acres and Phase III will be 33.89 acres. <br />(iii). The sequence of reclamation will be: <br />1. Lay slopes back during extraction at a 4H:1 V slope. <br />2. Seed following 12 months of no mining in any 3 acre area. <br />(f) Descriptions of the following: <br />(i). Fine grading: Maximum slope gradient to be 4H:1V. <br />(ii). Seeding: Please see seed types in Exhibit E subsection 2(d) <br />(iii). Fertilizing: No fertilizer required per Natural Resource Conservation <br />Service. <br />(iv). Revegetation: No trees, shrubs or other types of vegetation will be <br />planted other than what is to be seeded. <br />(v). Topsoiling: No topsoil will be replaced in this project. <br />