My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-22_GENERAL DOCUMENTS - C1981025
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981025
>
2009-12-22_GENERAL DOCUMENTS - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:00 PM
Creation date
12/23/2009 10:37:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
12/22/2009
Doc Name
Proposed Decision & Findings of Compliance for SL6
From
Partial Phase I/II/III
Permit Index Doc Type
Findings
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has received no written objections or requests for an informal conference regarding the <br />bond release application. <br />III. CRITERIA FOR BOND RELEASE <br />Phase I Bond Release <br />Section 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released <br />when the permittee successfully completes backfilling, regrading, and drainage control in accordance <br />with the approved reclamation plan." <br />Phase II Bond Release <br />A Phase II bond release is allowed by those parts of Section 3.03.1(2)(b) which say, <br />"Up to eighty-five percent of the applicable bond amount shall be released upon the <br />establishment of vegetation which supports the approved postmining land use...." <br />and "....which meets the approved success standard for cover based on statistically <br />valid data collected during a single year of the liability period." Section 3.03.1(3)(b) <br />states "No more than sixty (60) percent of the bond shall be released so long as the <br />lands to which the release would be applicable are contributing suspended solids to <br />streamflow or runoff outside the permit area in excess of premining levels as <br />determined by baseline data or in excess of levels determined on adjacent nonmined <br />areas". <br />Phase III Bond Release <br />Phase III is a final bond release. The entire permit area is being considered for Phase III release. A <br />Phase III bond release can occur when the following requirements are satisfied. <br />1. The applicable minimum period of liability has passed. [Section 3.02.3(2)(b)]; <br />2. The permittee has successfully completed all surface coal mining reclamation operations <br />in accordance with the approved reclamation plan [Section 3.03.1(2)(c)]; <br />All reclamation requirements of the Rules and the Act are fully met [Section 3.03.1(4)]; <br />and <br />4. The final inspection and evaluation procedures of Section 3.03.2 have been satisfied <br />[Section 3.03.1(2)(c)]. <br />11
The URL can be used to link to this page
Your browser does not support the video tag.