Laserfiche WebLink
a <br />site has been evaluated. This should occur within 6 months of drilling. As each <br />site's drilling is completed, the site will be reclaimed. <br />During construction of each access road and site, care will be taken to <br />minimize surface disturbance. Some sites may not need any excavation. others <br />will require severe disturbance. All will be reclaimed and reseeded after <br />exploration is completed. Very little topsoil is present at any of the sites. Most <br />sites are talus fields with little or no fines. If any fine material or topsoil is <br />encountered during access road and site preparation, it will be stockpiled for use <br />during reclamation of each site. Reclamation of each access road and drill site <br />will include re- contouring back to the original terrain, redistribution of large rocks <br />and reseeding. A photographic log of before and after drilling will be prepared <br />for each site and access road. Reclamation will take place as soon as possible <br />after drilling is complete. Most will be reclaimed the same year as drilling. - <br />4 <br />