Laserfiche WebLink
Appendix A — DRMS Form 2 Public <br />Lynx -Royal JV LLC Egnar HD12009 N01 <br />Five holes are proposed for the claim block. Approximate GPS coordinates (UTM NAD83 Zone <br />12) and hole particulars are shown in Table 1. The holes will start in sediments belonging to the <br />Brushy Basin Member of the Jurassic Morrison Formation and terminate below the principal ore - <br />bearing horizons of sandstones assigned to the Salt Wash Member of the Morrison Formation in <br />the project area. <br />Table <br />1: Pro <br />osed Drill <br />Hole Location <br />Particulars <br />Drillhole <br />UTIVI <br />Planned <br />Planned <br />Inclination <br />Declination <br />Planned Total <br />Zone <br />Easting <br />Northing <br />.. <br />.• <br />Depth <br />PdhP1 -A <br />12S <br />Confidential <br />Confidential <br />-90 <br />134 (440ft) <br />PdhP1 -B <br />12S <br />Confidential <br />Confidential <br />-90 <br />152 (500ft) <br />PdhP1 -C <br />12S <br />Confidential <br />Confidential <br />-90 <br />152 (500ft) <br />PdhP1 -D <br />12S <br />Confidential <br />Confidential <br />-90 <br />128 (420ft) <br />PdhP1 -E <br />12S <br />Confidential <br />Confidential <br />-90 <br />122 (400ft) <br />Total <br />5 holes <br />688 <br />(2260ft) <br />Drilling will be done by a truck - mounted rotary rig capable of drilling from 1,000 feet to 1,500 <br />feet or so, such as a Gardner- Denver 1500 or equivalent. Hole diameter will be in the 5 "to <br />6 "range, and cuttings will be removed by airlift. Although considered unlikely, a nominal 1,000 <br />gal to 2000 gal water truck will be available if water is needed to make an air /foam mixture. If <br />an air foam mixture is needed, then the foaming agent will be an environmentally benign, non- <br />hazardous and non -toxic product such as Quik- FoamTM or equivalent. <br />Cuttings will be directed into the containment pits at each site and mineralized cuttings will be <br />segregated within the pit. <br />Probing will be accomplished with a truck- mounted probe or portable unit possessing gamma <br />and electric logging tools. No tool with a radioactive source will be used. Water from the water <br />truck may be added to the hole to improve the down hole electrical characteristics. <br />Surface Disturbance <br />No roads will be constructed. The only surface disturbance anticipated will be the excavation of <br />five nominal 10 foot x 10 foot by 3 foot deep containment pits for cuttings and, if needed, air- <br />lifted water from the drill holes. The estimated disturbed area will be about 13ft X 18 ft to <br />accommodate the pit and stored material or 234 ft square per site, or 0.01 acres. The test pits <br />Page 2 of 5 <br />