My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 12/22/2009, 7:44:55 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 12/22/2009, 7:44:55 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:22 PM
Creation date
12/22/2009 8:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009036
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2009
Doc Name
New NOI, Prospecting, Form 2
From
Lynx-Royal JV LLC
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A — DRMS Form 2 Public <br />Lynx -Royal JV LLC Egnar F12009 N01 <br />about 2 feet of the surface. The remainder of the hole to the surface will be filled <br />with soil and cuttings. <br />Wet Hole — Non - flowing Aquifer. While not expected to occur, the hole will be <br />backfilled with a thick bentonitic mud with a > 50 second viscosity to a point 50 <br />feet above the static water level. The mud will be pumped to the bottom of the <br />hole through the drill pipe and the pipe will be periodically withdrawn as the mud <br />level rises in the hole. If closure occurs when the drill rig is not available, <br />3/8 "bentonite chips will be added to the hole in a manner as to avoid bridging <br />until the bentonite chip backfill column is at least 50 feet above the static water <br />level. The remainder of the hole will be backfilled as per a dry or damp hole. <br />Wet Hole — Flowing_ Aquifer. While considered highly unlikely, if a flowing <br />aquifer is penetrated, then drilling will pause and the permitting agencies will be <br />consulted for recommended abandonment methods. <br />B) Surface Restoration — To the extent possible, remaining drill cuttings will be placed <br />into the containment pit for burial. The disturbed ground will be graded and an <br />approved seed mixture (See Attachment C) will be broadcast immediately following <br />reclamation <br />Estimated Reclamation Costs <br />A) Estimated Cost of Drill Hole Abandonment. — The estimated cost of backfilling the <br />proposed drill holes is $1.25/ft. <br />B) Estimated Cost of Surface Restoration — Estimated cost of the surface restoration is <br />approximately $400.00 per hole. <br />Costs include all materials, labor, equipment, mob - demob, contractors overhead, profit and State <br />supervision charges. <br />Total reclamation cost is estimated at $4,950. <br />Compliance with Statues and Regulations <br />For exploration, Lynx -Royal JV LLC will use the services of contractors. All Lynx -Royal JV <br />LLC contracts with service companies will contain specific sections requiring compliance with <br />all applicable Federal, State and local statues and regulations. <br />Surface Use and Environmental Stipulations <br />Existing roads will be used for access to the proposed drill sites. No improvement of existing <br />roads is anticipated. Excessive surface deterioration that might be caused by vehicle in off -road <br />areas, particularly in wet weather, will be restored to the satisfaction of the Contracting Officer <br />as soon as practical after such conditions cease. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.