My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-04-21_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
1993-04-21_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2021 5:51:14 AM
Creation date
12/21/2009 1:50:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Revision
Doc Date
4/21/1993
Doc Name
Letter, Application & Public Notice
From
J.E. Stover & Associates
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J . 4 STOVER & ASSOCI*ES <br /> 2768 COMPASS DRIVE, SUITE 101 <br /> GRAND JUNCTION, COLORADO 81506 <br /> PHONE: (303) 245-4101, FAX 242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION dONSTRUCTION MANAGEMENT <br /> ApR 211993 <br /> April 19, 1993 ' <br /> a's Ueology 199 <br /> Harry Ranney C;eo1�g� <br /> Division of Minerals & Geology ®ivisio <br /> 1313 Sherman St. , Room 215 <br /> Denver, CO 80203 <br /> Re: Honeywood Coal Company <br /> Application for a Technical Revision <br /> Permit C-91-078 <br /> Dear Mr. Ranney: <br /> The Division's letter dated April 9, 1993 requested a technical <br /> revision to correct some permit deficiencies in the hydrologic <br /> monitoring plan. Enclosed is an application for a technical <br /> revision to revise and clarify the hydrologic monitoring plan <br /> section 2 .05.6(3) and Exhibit 3. Following are Honeywood's <br /> comments to the issues raised in the Division's letter: <br /> 1. The following changes were made to page 3-2 of Exhibit 3. <br /> A. Flow rate and water level was added to the parameter <br /> list. <br /> B. Units of measurement was added to the parameter list. <br /> C. A note was added to the bottom of the page that indicates <br /> underground water samples will be analyzed for dissolved <br /> parameters. <br /> D. A note was added to the bottom of the page that indicates <br /> surface water samples will be analyzed for total <br /> recoverable parameters except as noted. <br /> 2 . The baseline sample analysis included in Exhibit 3, presents <br /> data supplied by the testing laboratory. In some cases the <br /> laboratory did report results below the detection limit. The <br /> information contained in Exhibit 3 was revised so it does not <br /> show results below detection limits. <br /> 3. A new page 2 .05-35a is included that explains the sampling <br /> methods and how flow measurements are taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.