My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-17_REPORT - M1986147
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986147
>
2009-12-17_REPORT - M1986147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:49 PM
Creation date
12/21/2009 7:30:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986147
IBM Index Class Name
REPORT
Doc Date
12/17/2009
Doc Name
Annual Report
From
McAtee Construction Company
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eC5 <br />WATEE CONSTRUCTION iOMPANY <br />P.O. Box 1908 <br />STERLING, COLORADO 80751 <br />December 16, 2009 <br />Mr. Tony Waldron <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203 -2273 <br />Mr. Waldron: <br />Re: Annua port (112) <br />MLR No.✓M- 1986 -147, Harley Pit #1 <br />Anniversary Date: 12/02/09 <br />f ( "n <br />'/ DEC i <br />TV fV'' <br />This pit HAS NOT been granted a Temporary Cessation, and it <br />HASoperated more than 180 days this year. The Financial Warranty <br />for this operation is $71,755.00, the permitted area is in Logan <br />County, covers 89.53 ac. ± and the pit is not phased. The bond <br />was reevaluated in May 2007 when reclaimed area was released from <br />the permit area. As required in Rule 1.6 the MINE PERMIT SIGN is at <br />the entrance to the pit and the boundary has been outlined with <br />posts to delineate the Permit Boundary. <br />The annual report requirements in the MLRB Rules and Regula- <br />tions are addressed in the following report. Please refer to the <br />2009 ANNUAL REPORT MAP submitted as part of this packet for the <br />location of the areas discussed in this report. <br />(1) We continued to remove material stockpiled last year. <br />Mining continued on the west area that was stripped in 2007 <br />(tan). The working floor area where material is stockpiled <br />and processes covers approximately 15.55 acres (orange). <br />(2) On 3.03 acres of the west area reclamation has been com- <br />pleted. The area was seeded this spring and the grasses are <br />growing (green). We continue to monitor the 1.56 acres +/- <br />seeded in 2006 (green). To date reclamation appears to be <br />successful. <br />(3) We will continue to removed stockpiled material and mine <br />into the working face on the south side of the mine floor <br />(brown). Stripping will continue on the area south of the <br />mine face. The soil will be stockpile around the mine or <br />placed on west area where final grading is complete. We <br />expect to mine approximately 2.00 acres next year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.