Laserfiche WebLink
J. J. Dudash -3- December 10, 2009 <br />Consumptive Use of Water <br />Bowie will pipe water from the Bowie No. 2 Mine to the shaft construction site. <br />Therefore there will be no depletion of water from Terror Creek. <br />Reclamation Estimate <br />A reclamation estimate is enclosed. The estimated reclamation expense is $225,000. <br />The revisions to one of the sets of Volume I text are shown with grey highlighting. <br />The following data are enclosed to support this technical revision application: <br />Volume 1 - 2.05-11, 2.05-15, 2.05-16, 2.05-68 <br />Volume II - Table of Contents and New Map-42 <br />Volume III - Pages Exh-8-238 through Exh-8-245 <br />Sketch of Raise Bore Temporary Facilities <br />Bond Estimate <br />Sincerely, <br />/Z? <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr.