Laserfiche WebLink
y� <br /> ., '��R `,fie+[^,1►-- <br /> yk'a <br /> Underdrain ditch Installing underdrain material <br /> General Mine Plan Compliance <br /> The Molly Brown dragline is currently working at K-Ridge in addition to the Truck/Loader fleet. The <br /> Loader was not active at the time of the inspection due to a down day. No problems were noted with <br /> mining progress in the K-Ridge Area. <br /> r . <br /> - = 4a <br />