My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-09_PERMIT FILE - M2009079
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009079
>
2009-12-09_PERMIT FILE - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:32 PM
Creation date
12/15/2009 8:18:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
PERMIT FILE
Doc Date
12/9/2009
Doc Name
Response letter dated 12/07/2009
From
Baseline Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) Reclamation will proceed within each mine block as enough space is established <br />to allow safe equipment circulation and areas for processing and stockpiles. The <br />reclamation will be completed as follows: <br />2010 -2013 Reclamation of block 1 <br />2013 -2016 Reclamation of block 2 <br />2016 -2020 Reclamation of block 3 <br />(f)(i) Final Grading — Maximum 3:1 slopes. General grade of 1% to 5% along the <br />bottom of the pit. <br />(ii) Seeding — See above. <br />Revegetation — See above. <br />Topsoiling — See above. <br />(3) The operator commits to ensuring no livestock will be permitted on site until the <br />permit or area is released by DRMS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.