Laserfiche WebLink
(e) Reclamation will proceed within each mine block as enough space is established <br />to allow safe equipment circulation and areas for processing and stockpiles. The <br />reclamation will be completed as follows: <br />2010 -2013 Reclamation of block 1 <br />2013 -2016 Reclamation of block 2 <br />2016 -2020 Reclamation of block 3 <br />(f)(i) Final Grading — Maximum 3:1 slopes. General grade of 1% to 5% along the <br />bottom of the pit. <br />(ii) Seeding — See above. <br />Revegetation — See above. <br />Topsoiling — See above. <br />(3) The operator commits to ensuring no livestock will be permitted on site until the <br />permit or area is released by DRMS. <br />