Laserfiche WebLink
CIRCES Cost Estimating Softwa <br />crReaFR - ()NLY WORK <br />PROJEC IDENTIFICATION <br />Agency or organization name DRMS <br />Task #: 03a State : Colorado <br />Date : 1210912009 County : Mesa <br />User : THM Site : Soaring Eagle Gravel Pit <br />Permit/job # : M -1999 -025 <br />Abbreviation : none <br />Filename : MO25 -03a <br />Permit or other job action :Final Reclamation Cost Estimate Update <br />Task description Final Reclamat Cost Estimate Update <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Model Cat 633E Series 2 (2 1) <br />Job utilization % <br />Horsepower : <br />490 <br />Cost Breakdown : <br />NA <br />Weight (UST) : <br />56.34 <br />Ownership cost/hour: <br />$80.67 <br />100 Cost data source : <br />(CRG) <br />Operating cost/hour : ___ j124 <br />44 <br />Operator cost/hour : <br />$38.72 <br />NA <br />Total unit cost/hour: <br />$ 243.82 <br />Total fleet cosUhour : <br />$243.82 <br />:::::::.....:.......... <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 6 LCY <br />factor : <br />NA volume: <br />64,000 LCY <br />Source of quantity take -off :Max. <br />4500 LF of 16 highwall backfilled to 3H:1 V <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Hauling Capacity <br />Scraper Bowl e) Basis: <br />Scraper Pa yload (weight) Basis : <br />2,400 <br />/LCY <br />Ptruck volume : <br />23.20 <br />LCY <br />Material weight: <br />pounds <br />Heaped volume: <br />34.00 <br />LCY <br />Material description : <br />Average volume: <br />28.60 <br />LCY <br />Clay and gravel - Dry <br />Rated payload: 82,000 <br />pounds <br />Payload capacity : 34.17 <br />LCY <br />Adjusted capacity : <br />28.60 <br />LCY * ** <br />Cycle Time (load +haul + saread +return) <br />Loading time: <br />0.90 <br />minutes <br />Maneuver and spreading time : <br />0.70 <br />minutes <br />loading time per pair on push -pull models <br />Travel time: <br />Route Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />*= <br />Ha ul : <br />900 <br />0.0 <br />5.0 <br />5.0 <br />1,375 <br />0.80 <br />mi nutes <br />Return : <br />900 <br />0.0 <br />5.0 <br />5.0 <br />2,288 <br />0.39 <br />minutes <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />2.79 <br />minutes <br />velocities are max. attainable per total resistance shown, not average <br />cycle time <br />c <br />Total y <br />Job Condition Correction Factors : <br />Site altitude (feet) : 4,500 <br />Adjusted Hourly Production; <br />* ** <br />Altitude adjustment factor : 1.00 <br />(Cat HB) <br />Unadjusted unit production : <br />614.76 <br />LCY /Hour <br />Job efficiency factor : 0.83 <br />(1 shift/day) <br />Adjusted unit production : <br />510.25 <br />LCY /Hour <br />Adjusted fleet production : <br />510.25 <br />LCY /Hour <br />Net job correction factor : 0.83 <br />" 2 times volume on push -pull models <br />JOB TIME AND COST <br />1 <br />Scraper(s) <br />Total job time: <br />125.43 <br />Hours <br />Fleet size : <br />Unit cost: $0. 478 <br />/LCY <br />Total job cost : <br />$30,582 <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Model Cat 633E Series 2 (2 1) <br />