My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-10_INSPECTION - M1999025
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999025
>
2008-12-10_INSPECTION - M1999025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:46 PM
Creation date
12/15/2009 8:18:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
INSPECTION
Doc Date
12/10/2008
Doc Name
Reclamation cost update
From
DRMS
To
Grand Junction Pipe and Supply Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating So ftware <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 01a <br />Date : 12/09/2009 <br />User: THM _ <br />State :Colorado <br />County :Mesa <br />Site Soaring Eagle Gravel Pit <br />Agency or organization name DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Dewater 35 acre pit with 11 foot depth <br />HOURLY EQUIPMENT COST <br />Pump Centrifugal pump - 200M, 10 in. <br />Su ction hose : Suction pipe - 10 in. diam., 25 ft. <br />Discharge hose :Discharge pipe - 10 in. D., 25 ft. <br />Labor:NA <br />Permit/job no.: 1999 -025 <br />Abbreviation : none <br />Filename :MO25 -01a <br />Cost Breakdown : <br />per day <br />Job Utilization :: <br />Ownership cost/hour : <br />$16.21 <br />NA <br />Operating cost/hour : <br />$42.16 <br />100 % <br />Operator cost/hour : <br />$0.00 <br />NA <br />Total cost/hour : <br />$58.37 <br />Total fleet cost/hour <br />PUMPING QUANTITIES <br />201,000 <br />iP <br />Final pond <br />Initial pond <br />4,500 <br />Conversion <br />1.000 volume <br />volume: 125,444,088.00 <br />gallons <br />factor : <br />Data <br />Quantity Source <br />2 (CRG) <br />4 (CRG) <br />8 (CRG) <br />0 NA <br />Job shift basis : <br />per day <br />Horsepower: <br />70 <br />Weight (UST) :_ <br />1.95 <br />$58.37 <br />125,444,088 gallons <br />Unit inflow rate in Total pond inflow volume <br />Total pond inflow surface : <br />area: 2,300 sq.ft. gph /sq. ft. : 0.0879 P er hour 202.17 <br />Source of volume estimate :Assume 2,300'L x 10'H river side pit slope <br />PUMPING TIME <br />402,000 <br />gph <br />Maximum pump capacity: <br />70 <br />gph /pump <br />Estimated suction head : <br />15 <br />feet <br />Estimated discharge head : <br />20 <br />feet <br />Total head: <br />35 <br />feet <br />CPB pump capacity : <br />201,000 <br />gph /pump <br />Site altitude : <br />4,500 <br />feet <br />Inflow as % of pond volume: <br />NA <br />% <br />JOB TIME AND COST <br />Unit cost : $0.000163 per gallon <br />gph <br />Adjusted pumping capacity : <br />402,000 <br />gph <br />Initial unadjusted pumping time <br />312.05 <br />hours <br />Inflow during initial pumping : <br />63,087 <br />gallons <br />Net unadjusted pumping time : <br />312.21 <br />hours <br />Altitude adjustment factor : <br />1.0309 <br />(3% rule) <br />Pump efficiency factor: <br />1.0909 <br />(55 min. /hr.) <br />Total adjusted pumping time : <br />351.12 <br />hours <br />Total job time : <br />351.12 <br />hours <br />Total job cost: <br />$20,496 <br />
The URL can be used to link to this page
Your browser does not support the video tag.