amE�c <br />Earth 8 Environmental <br />E) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />F) Cult to Fill <br />1) VLF <br />Snow from the weekend snowfall was removed from all fill areas prior to any placement. Prior <br />to structural fill placement, existing fill temperature were monitored and to be or above 33 °F. <br />Ambient were monitored on an hourly basis, by an AMEC representative during fill placement. <br />Fill temperatures averaged approximately 33 °F during the period of time the ambient <br />temperature was below 32 °F. <br />Structural fill (processed ore) was placed within the Phase IV VLF, between stations G12 +00 <br />( + / -) and G29 +00 ( + / -), approximately 75 to 150 feet left of centerline. Fill material (processed <br />ore) was excavated from the SE corner of Phase IV area using a CAT 375 excavator loading <br />the material into 40 -ton articulating haul trucks. Structural fill was placed using a CAT D -8 <br />dozer and a CAT D -6 LGP (low ground pressure) dozer in 12" loose lifts and moisture <br />conditioned as needed using a CAT 773 water truck. Compaction was achieved using a 10 -ton <br />vibratory smooth drum compactor. Nuclear density testing was performed with results <br />averaging 95% of maximum dry density. Moisture density relations were obtained in <br />accordance with ASTM D698 -07. <br />Structural fill was placed in the following areas: Downstream toe, between stations D0 +50 <br />( + / -) and D4 +00 ( + / -), approximately 0 to 50 feet right and left of centerline. Fill material was <br />excavated between stations E15 +00 ( + / -) and E17 +50 ( + / -), approximately 0 to 50 feet right of <br />centerline using one CAT 385 excavator loading the material into CAT 777 haul trucks. <br />Structural fill was placed between stations 132 +00 ( + / -) and 134 +00 ( + / -) and between stations <br />F 1 +50 ( + / -) and 3 +50 ( + / -), left and right of both centerlines 0 to 100 -feet. Spreading and <br />keying the fill in loose lifts using a CAT D -8 dozer and a CAT D -9 Dozer. A CAT 385 <br />excavator and a John Deere 850 excavator was used to excavate structural fill material between <br />stations E15 +00 ( + / -) and E16 +50 ( + / -), approximately 0 to 50 feet right of centerline and <br />between stations G8 +00 ( + / -) and G10 +00 ( + / -), 200( + / -) feet left of centerline. Additional cut <br />was excavated from the NW quadrant of "Substation Hill" (previously "shot" area). The <br />structural fill material was loaded into CAT 777 haul trucks. Compaction was achieved using a <br />CAT 10 -ton vibratory smooth drum compactor passing over the entire fill surface a minimum <br />of 4- passes (method compaction technique is applicable). <br />Blast pattern drilling was performed in the following areas: Between stations H5 +00 ( + / -) and <br />H7 +00 ( + / -), approximately 20 to 50 feet right of centerline: N. W. quadrant and S. W. <br />quadrant of "Substation Hill" using three track mounted drill rigs. Blasting was performed in <br />these areas Tuesday (11/17/2009), Wednesday (11/18/2009), and Thursday (11/19/2009). <br />VLF Weekly Report WE 11.21.09.D.doc <br />