amE. <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 21, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 11/15/09 through 11/21/09 <br />Days <br />S <br />M <br />T <br />W <br />T <br />I F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D- <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 20 °F to 32 ° F ( + / -) High: 36 °F to 55 ° F <br />AMEC CQ►A: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Limited work activities on the morning of the 16` due to weekend snows. <br />No weather related delays during the week. <br />CONSTRIUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations H0 +00 ( + / -) and H3 +00 ( + / -), approximately <br />20 feet left to 20 feet right of centerline using a CAT D -9 dozer, and a CAT 345 excavator. <br />Material generated during slope contouring was pushed down slope at the cut progressed. <br />VLF Weekly Report WE 11.21.09.D.doc <br />