My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-11_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-12-11_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/15/2009 7:04:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/11/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: 11/15/09 and 11/22/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amE� <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 28, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 11/22/09 through 11/28/09 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />- <br />- <br />- <br />- <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 16F to 21 ° F ( + / -) High: 30 °F to 45 ° F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: No work activities were performed between 11/25/2009 and 11/28/2009 in observance of the <br />Thanksgiving holiday. <br />CONSTRIUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in between stations B2 +00 ( + / -) and 134 +00 ( + / -), <br />approximately 50 to 100 feet left of centerline and between stations F2 +00 ( + / -) and F5 +00 <br />( + / -), approximately 100 to 400 feet right of centerline. Contouring was performed using <br />various CAT dozers and various CAT excavators. Material generated as the cut progressed was <br />pushed down the slope. <br />VLF Weekly Report WE 11.28.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.