My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-12-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/15/2009 6:59:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/11/2009
Doc Name
Weekly Construction Quality Assurrance ("CQA") Report: 11/08/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and documented ambient and fill temperatures, as well as the placement of structural fill <br />within the Phase 5 VLF fill area. <br />AMEC observed and documented ambient and fill temperatures, as well as the structural fill placement <br />(processed ore) within the Phase IV VLF constantly. Nuclear density testing was performed during <br />placement. <br />AMEC observed geomembrane exposure at the Phase IVc re- certification constantly. <br />AMEC inspected and approved the soil liner fill surface at the Phase IVa and Phase IVc re- certification <br />areas. <br />AMEC observed geomembrane installation for the Phase IVa and Phase IVc re- certification areas <br />constantly. <br />AMEC observed the anchor trench backfill at the Phase IVa re- certification constantly. <br />AMEC inspected and approved the installed and existing geomembrane Phase IVa and Phase 1Vc re- <br />certification. <br />AMEC observed drain cover fill placement for the Phase lVa and Phase IVc re- certification areas <br />constantly. <br />AMEC observed construction of the ADR/Crushing waterlines. <br />AMEC inspected encountered underground workings within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture- Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Structural fill placement within the Phase 5 VLF footprint will continue. <br />Continue processing soil liner fill at the South Cresson Clay Processing area. <br />Continue subgrade preparation within the Phase 5 VLF footprint. <br />VLF Weekly Report WE 11.14.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.