My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-03_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-12-03_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:26 PM
Creation date
12/8/2009 2:09:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/3/2009
Doc Name
Amend Mine Plan Complete Submittal
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.6(6) <br />Pond P-1 is located in a zone of greatest subsidence impact. For this <br />reason, this pond will be protected by a limited extraction zone. The limited <br />extraction zone is defined by extending a safety zone a distance of fifty feet <br />around the pond and then projecting a line down at the angle of draw until it <br />intersects the coal seams. <br />Pond P-2 is located in a zone of intermediate subsidence, however the <br />overburden below P-2 is nearly 1,000 feet. For all practicable purposes P-2 <br />is in a zone of minor subsidence. Therefore, no limited extraction zone will <br />be provided for Pond P-2. <br />Ponds P-3 through P-6 are located in a zone of minor subsidence in an area <br />of overburden greater than 1,000 feet. Therefore, no limited extraction zone <br />will be provided for Ponds P-3, P-4, P-5 and P-6. <br />Five additional ponds are located within the permit boundary in zones of <br />minor subsidence. They are Pond 33-3, Spring/Pond 33-5, Pond 33-7, <br />Spring/Pond 34-2 and Spring/Pond 34-11. Two ponds are located outside of <br />the permit boundary in zones of minor subsidence. They are Pond 32-3 and <br />Spring/Pond 33-6. Refer to Map 9, Hydrologic Location Map for location <br />information. <br />No limited extraction zones are proposed for any of the ponds except Pond <br />P-1 because they all lie in zones of minor subsidence impact. <br />A limited extraction zone was established along the bleeder entries in the <br />vicinity of Freeman Gulch and the vent shaft in Freeman Gulch. This limited <br />extraction zone was established to assure subsidence does not affect the <br />stability of adjacent old landslides to the extent their deformations were <br />renewed. <br />Portions of Terror Creek, Hubbard Creek, Hubbard Creek road and Terror <br />Creek road are located in zones of intermediate and greatest subsidence <br />impact. For this reason, these areas will be protected by a limited extraction <br />zone. The limited extraction zone is defined by extending a safety zone a <br />distance of one hundred feet from the creek then projecting a line down at <br />the 25° angle of draw to the coal seam. <br />0 <br />TR-65 2.05 -113 - 12/09
The URL can be used to link to this page
Your browser does not support the video tag.