My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-03_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-12-03_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:26 PM
Creation date
12/8/2009 2:09:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/3/2009
Doc Name
Amend Mine Plan Complete Submittal
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.6(6) <br />Hubbard Creek road, Terror Creek road and numerous jeep trails in the <br />permit and adjacent area could be damaged by a subsidence crack causing <br />a hazard to foot or vehicle traffic. Repairs to the roads and trails will be <br />performed by appropriate earth-moving equipment. Typically, roads and <br />trails are maintained on an annual basis, as required, to access <br />environmental resources monitoring stations. Persons using trails will be <br />notified of any hazards. Those persons are typically the Operator's <br />employees, hunters and monitoring personnel. Terror Creek Road is outside <br />of the projected angle of draw so no damage is predicted. <br />The Hughes' cabins are both located in limited extraction zones so the <br />mining operation will not have any effect on the cabins. Additionally, the <br />cabins are outside of the projected angle of draw so no damage is predicted. <br />It is not expected that subsidence will affect the stability of old landslides to <br />the extent that their deformations could be renewed. Attention will have to <br />be paid to mining close to the coal outcrop. The Operator will leave one row <br />of development pillars between the outcrop and extracted pillars within the <br />panel. No repairs are currently required, but procedures could be developed <br />if studies show outcrop barrier pillar problems are anticipated. <br />Differential vertical settlement due to subsidence over a short distance could <br />result in local changes in ground surface and slopes. If such changes occur <br />along an ephemeral or intermittent stream channel, the stream's gradient will <br />change. Any gradient change will impact the stream characteristics. In an <br />extreme case, gradient changes may disrupt the flow. Such an event is not <br />probable in topographic conditions of the area where most stream channels <br />are relatively steep. Flow through the drainages could temporarily be <br />affected by a subsidence crack across a stream channel, however, the crack <br />would be expected to heal fairly quickly so the surface drainage pattern <br />would be naturally restored. <br />Very little flow has been recorded for the various ephemeral and intermittent <br />steams in the permit and adjacent area. These streams are expected to be <br />typically dry with flow occurring during spring snowmelt and after significant <br />precipitation events. Therefore, short term disruptions in the flow from these <br />streams should have very little impact on the water budget for Hubbard and <br />• Terror Creeks. <br />TR-65 2.05 - 108 - 12/09
The URL can be used to link to this page
Your browser does not support the video tag.