Laserfiche WebLink
PROJECT: Cherokee Clay Mine <br />SUBJECT: Runoff Coefficients <br />Basin: O <br />Hydrological Group: B <br />JOB #: 2008 -010 <br />DATE: 9/17/2008 <br />BY: jaw <br />CHECKED BY: jvg <br />urface Type <br />% Total Area <br />C10 <br />C100 <br />Weighted C10 <br />Wei hted C100 <br />Natural <br />89.50% <br />0.17 <br />0.36 <br />0.15 <br />0.32 <br />raveled Road <br />10.50% <br />0.50 <br />0.60 <br />0.05 <br />0.06 <br />OTALS <br />100.00% <br />0.17 <br />0.36 <br />0.20 <br />0.39 <br />Basin: Al <br />Hydrological Group: B <br />S urface Type <br />% Total Area <br />C10 <br />C100 <br />Wei hted C10 <br />Wei hted C100 <br />C lay Stockpile <br />35.43% <br />0.26 <br />0.51 <br />0.09 <br />0.18 <br />T opsoil Stockpile <br />20.78% <br />0.17 <br />0.36 <br />0.03 <br />0.08 <br />Natural <br />43.78% <br />0.17 <br />0.36 <br />0.07 <br />0.16 <br />[T OTALS <br />100.00% <br />1 <br />1 <br />0.20 <br />0.41 <br />Basin: A2 <br />Hydrological Group: B <br />urface Type <br />% Total Area C10 <br />C100 <br />Wei hted C10 <br />Wei hted C100 <br />Natural <br />73.06% 0.17 <br />0.36 <br />0.12 <br />0.26 <br />raveled Surface <br />26.94% 0.50 <br />0.60 <br />0.13 <br />0.16 <br />OTALS <br />100.00% <br />1 <br />0.26 <br />0.43 <br />2008 -010 Runoff Coefficient Page 1 Gagliano Engineering, Inc. <br />