Laserfiche WebLink
PROJECT: Cherokee Clay Mine <br />SUBJECT: Time of Concentration <br />JOB #: 2008 -010 <br />DATE: 9/17/2008 <br />BY: jaw <br />CHECKED BY: A <br />2008010- TC.xls <br />Page 1 Gagliano Engineering, Inc <br />INITIAL / OVERLAND <br />TRAVEL TIME <br />FINAL <br />Time to <br />Peak Flow <br />TIME (Ti) (Max. 5007 <br />(Tt) <br />Tc <br />Basin <br />Area <br />Elevations <br />Dist. <br />Slope <br />Ti <br />Elevations <br />Dist. <br />Slope <br />Vel. <br />Tt <br />No. <br />(acres) <br />C5 <br />Upstream <br />Downstream <br />(ft) <br />N <br />(min) <br />Upstream <br />Downstream <br />(ft) <br />( % ) <br />(fps) <br />(min) <br />O <br />2.04 <br />0.088 <br />5922 <br />5919 <br />82 <br />3.7 <br />10.7 <br />5919 <br />5907 <br />632 <br />1.9 <br />2.0 <br />5.3 <br />16.0 <br />16.0 <br />Al <br />0.68 <br />0.193 <br />5916 <br />5915 <br />45 <br />2.2 <br />8.4 <br />5915 <br />5911 <br />202 <br />2.0 <br />2.1 <br />1.6 <br />10.0 <br />10.0 <br />A2 <br />1.53 <br />0.193 <br />5927 <br />5920 <br />107 <br />6.5 <br />9.0 <br />5920 <br />5907 <br />236 <br />5.5 <br />3.5 <br />1.1 <br />10.2 <br />11.0 <br />2008010- TC.xls <br />Page 1 Gagliano Engineering, Inc <br />