Laserfiche WebLink
sheet 2 of 2 <br />ROADABLE EG2u1rmtrv i <br />Machine <br /> <br />Description <br />-Water Tanker, 2,500 Gal. <br />Total <br />Cost/hour/unit <br /> <br />$45.35 <br />Fleet Size <br />(No. units) <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$45.35 <br />34 <br />$47 <br />Return Trip <br />Cost/hr/fleet <br />$45.35 <br />34 <br />$47 <br />-Flatbed Truck, 4x2, 30K GVW $47.34 1 . . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $92.70 $92.70 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br />h <br />0 m <br />35 <br /> Roadable Roadable Average travel speed : p <br />. <br /> Equipment Equipment <br />14 <br />0 <br />Total non-roadable mob/demob cost' : <br />$5,386.59 <br />Haul time (hours) = 0.14 . <br />Return time (hours) = 0.14 0.14 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $26.48 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.29 0.29 <br /> Total job time : 2.57 hours <br />JOB TIME AND COST Total job cost : $5,413