Truck/Loader Team Work cont'd Task #: 081 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 5 <br />Excavators and front shovels -machine cycle time vs. job condition rating : BELOW AVERAGE <br />-selected value within basic rating : SEVERE <br />sheet 2 of 2 <br />passes <br />Track loaders -material descr.: NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml NA <br />Dump : 0.100 <br />minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : NA NA NA <br />Stockpile : NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.390 minutes <br /> Net load time per truck * : 1.660 minutes <br />Truck Cycle Time : *bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 1.660 minutes........ Adjusted for site altitude : 1.660 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.800 minutes <br />**set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition :Firm, smooth, rolling, dirtIlt. surfaced, watered, maintained <br />Haul route : <br />Road <br />segment # Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 10,000 5.00 3.00 81.00 1381 7.266 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time ** : 7.266 minutes <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 3.509 minutes <br />total haul and return time shown includes altitude adjustment Total truck cycle time : 13.735 minutes <br />Loading tool unit production : 234.37 LCY/hour...... Adjusted for job efficiency : 194.53 LCY/hour <br />Truck unit production : 36.86 LCY/hour...... Adjusted for job efficiency : 30.59 LCY/hour <br />Optimal no. trucks/loading tool : 6 trucks........... Selected no. trucks/loader : 4 trucks <br /> Adjusted hourly truck team production : 122.37 LCY/hr <br /> Adjusted hourly single truck/loader team production : 122.37 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 122.37 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 653.77 Hours <br />Unit cost : $3.127 /LCY Total job cost : $250,135