My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task 081 State : Colorado Permit/job #: C-1994-082 <br />Date : 1210412009 County :Routt Abbreviation :none <br />User:- JRS Site : Yoast Mine Filename : C082-081 <br />Permit or other job action : Partial Phase I Bond Release SL-02 <br />Task description : Clean Sediment Ponds 010, 011, 011A, 012, 012A and 014 Two Times <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Generic 8-10 cy, 6x4 <br />-Loader: Cat 330C L <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA NA NA NA <br />% Utilization-machine : 100 82 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $10.10 $45.38 NA NA NA NA <br />Operating cost/hour : $31.23 $44.05 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.72 NA NA NA NA <br />Unit subtotals : $63.61 $128.15 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $382.60 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $382.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 80,000 LCY factor : NA volume : 80,000 <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,700 pounds/LCY Struck volume : 8.00 <br />Descr.: Earth - Wet excavated Heaped volume : 10.00 <br />Rated payload : 27,280 pounds Average volume : 9.00 <br />Payload capacity : 10.10 LCY Adjusted volume': 10.00 <br /> Final truck volume based on number of loader passes : 8.44 <br /> "truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 2.250 LCY Truck Loader <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 0.750 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity : 1.688 LCY Net correction : 0.830 0.830 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />7,500 <br />Source
The URL can be used to link to this page
Your browser does not support the video tag.