Laserfiche WebLink
y STATE OF COLORADO <br />DIVISION OF, RECLAMATION, MINING AND SAFETY <br />• Department of Natural Resources <br />1313 Sherman St, P4 64 <br />. <br />Detrver,.;olorado ?`- '- 3i' <br />COLORADO <br />D I V I S 1 o N o f <br />Fho>I131t3}864-356 RECLAMATION <br />FAX,003k:43Z4106 MIN ING <br /> -&- <br /> SAFETY <br /> Bill Ritter, Jr. <br />September 22, 2009 Governor <br /> Harris D. Sherman <br />Forrest V. Luke Executive Director <br />Trapper Mining, Inc. Ronald W. Cattany <br />P.O. BOX 187 Division Director <br />Craig, CO 81626 Natural Resource Trustee <br />Re: Trapper Mine (Permit No. C-1981-010) <br />Proposed Decision <br />Permit Revision Application No. 6 (PR-6) <br />Dear Mr. Luke: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for Permit <br />Revision No. 6 at the Trapper Mine. Notice of the proposed decision will be published in the Craig Daily Press as <br />soon as possible. The first publication will initiate the thirty (30) day public comment period for the Division's <br />• decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please be advised that federal mine plan approval needs to be obtained from the Office of Surface Mining <br />Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, is required, before <br />operations affecting federal coal may commence. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Permit Revision must not be implemented until this proposed decision <br />becomes final and until any required increase in bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />6/ ` <br />Jason D. 4 sick <br />Environmental Protection Specialist <br />Enclosure(s) <br />• <br />C-PR-08 C1981010 JDM 09222009 1 1 3337.doc <br />. Office of <br />Mined Land Reclamation <br />Denver - Grand Junction - Durango <br />Office of <br />Active and Inactive Mines <br />