Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ SENECA. COAL CO. Permit C-005-80 Field Visit <br />Person Number Date 07/14/0200 Continuation Page <br />l28. Performance Standard Categories <br />Codes: 1=Compliance, 2==Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. <br />Administrative <br />1. _ Mining within Valid Permit <br />2 _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. Liability Insurance <br />5. _ Ownership and Control <br />6. Temporary Cessation <br />7. - AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4. Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />11. Stream Buffer Zones <br />D. Backfilling & Grading Subsidence Control Plan <br />H. <br />1. Exposed Openings _ <br />I. Roads <br />2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3. 1 Approximate Original Contour 2. Certification <br />4. Highwall Elimination 3. 1 Drainage <br />5. 1 Steep Slopes (includes downslope) 4. Surfacing and Maintenance <br />6. Handling of Acid & Toxic Materials 5. 1 Reclamation <br />7. 1 Stabilization (rills and gullies) J. Signs & Markers <br />E. Excess Spoil Disposal 1. Signs <br />1. _ Placement 2. Markers <br />2. - Drainage Control K. Distance Prohibitions <br />3. - Surface Stabilization - <br />L. <br />e <br />4. - Inspections & Certifications . 1 Vegetative <br />Cover <br />1. <br />F. Coal Mine Waste <br />2. 1 Timing <br />( Refuse Piles/Impoundments) Postmining Land Use <br />M. <br /> <br />1 . Drainage Control <br />- <br />2. _ <br />Surface Stabilization N. Other <br />3. Placement General <br />4. Inspections and Certifications Performance <br />5. Impounding Structures Catagory <br />G. Use Of Explosives D 1 I) phase I bond release <br />1. Blaster Certification - - <br />2. _ Distance Prohibitions 2) <br />3. Blast Survey/Schedule - - <br />4. _ Warnings & Records 3) <br />5. Control of Adverse Effects - - <br />C. Topsoil & Subsoil <br />1. 1 Removal <br />2. Substitute Materials <br />3. 1 Storage and Protection <br />4. 1 Redistribution <br />Performance Standard Catagories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />30 CFR Counterpart 1. Placement ................................................................... ........................71(e) <br />A. Administrative .................................. ....................................... 2. Drainage Control....................................................... .........................71(f) <br />1. Valid Pennit .................................................... .................................773.11 3. Surface Stabilization .................................................. .............. <br />........... 71(g) <br />2. Mining within Bonded Area .................. ..............................773.11 4. Inspections & Certifications....................................... ........................ 71(h) <br />3. Terms & Conditions of Permit ............... ..............................773.17 F. Coal Mine Waste (Refuse Piles/Impoundments) .. ...(816/817.81-84) <br />4. Liability Insurance ................................................................800.60 <br />5. Ownership and Control .......................................... .........778.13 <br />1. Drainage Control ....................................................... <br />........................83(a) <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.131 2. Surface Stabilization.................................................. <br />3 <br />Placement <br />.. <br />..... ........................ <br />........................ 83(c) <br />7. AML Rec. Fees -- Non-Respondant ....... <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(b) <br />.........................870.15(.) . <br />........................................................... <br />. <br />4. Inspections and Certifications.................................... ....................... 83(d) <br /> 5. Impounding Structures ............................................... ............................84 <br />B.' Hydrologic Balance ........................... ...........(816/817.41-57) <br /> <br />G. Use of Explosives .............................................. <br />(816/817.61-68) <br />.... <br />1. Drainage Control .................................... <br />2. Inspections & Certifications ................... .....................................45 <br />..........................49(a)(10) 1. Blaster Certification................................................... ........................ 61(c) <br />Siltation Structures ................................. <br />3 .....................................46 2. Distance Prohibitions ................................................. ........................ 61(d) <br />. <br />4. Discharge Structures ............................. ......................................47 3. Blast Survey/Schedule ....................................................................... <br /> 62-64 <br />5. Diversions .............................................. .....................................43 4. Warnings & Records ............... .................................. ..................... <br /> 66 & 68 <br />6. Effluent Limits ....................................... .....................................42 5. Control of Adverse Effects ........................................ ............................. <br /> 67 <br />7. Ground Water Monitoring ......................................................41(c) H. Subsidence Control Plan ......................................... (817.121-122) <br />8. Surface Water Monitoring ..................... .................................41(e) I. Roads ................................................................. (816/817.150-151) <br />9. Drainage--Acid - Toxic Materials .......... .................................41(f) <br />10. Impoundments ....................................... .....................................49 1. Road Construction ..................................................... ...................... <br /> 150(c) <br />Stream Buffer Zones . <br />......... <br />............ <br />11 <br />.... .....................................57 2. Certification............................................................... ....................... 151(a) <br />. <br />. <br />.. <br />. 3. Drainage .............. ....................................................... .......... 150(b)-151(d) <br />C. Topsoil & Subsoil .............................. .................(816/817.22) 4. Surfacing and Maintenance ........................................ .......... 150(e)-151(d) <br />1. Removal ................................................. .................................22(a) 5. Reclamation ............................................................... .................... <br />... 150(f) <br />2. Substitute Materials ................................ .................................22(c) J. Signs & Markers ............................................. ..........(816/817.11) <br />3. Storage and Protection ............................ .................................22(c) <br />......................................... <br />1 <br />Signs <br />. <br />. <br />........... 1 l (a) <br />&(c) <br />(b) <br />4. Redistribution ......................................... ................... .. ..22(d) . <br />.......................... <br />.. <br />... <br />2. Markers ...................................................................... , <br />, <br />I I (a),(b),(d),(e),&(f) <br />7.9 <br />D. Backt-filling & Grading ..............................(816/817.95-107 ) K. Distance Prohibitions ...................................... ................. (761.11) <br />1. Exposed Openings .....................816/817. 13, 14, 15, & 823.11 & 21 L Revegetation.................................................... . (816/817.111-116) <br />2. Contemporaneous Reclamation ............... <br />3. Approximate Original Contour ................ ...................................100 <br />..........................102(a)(1) <br />1. Vegetative Cover ....................................................... <br />................ 111 & 116 <br />4. Highwall Elimination ............................... ..........................102(a)(2) 2. Timing ....................................................................... ......................... <br />.. 1 13 <br />5. Steep Slopes (includes downslope) .......... ..................................107 M. Postmining Land Use.............................................. (816/817.133) <br />6. Handling of Acid & Toxic Materials ....... ...............................102(c) <br />7. Stabilization (rills and gullies) ................. .................................95(b) Revised December 4.1995 Page 2 of