Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Programs y <br />1. Pennittee/Person 9. Permit Numb'er.. 10. Permit Type <br /> SENECA COAL CO. C-005-80 PP <br /> 2. Address _ 11. Field Visit Date 12. Purpose 13. SRA Present <br /> P. O. BOX 670, C/O ROY KA 07,/14/0200 OB1 E <br />3. City - 4. State mm - dd - yyyy <br /> <br /> <br />; <br />" CO <br />HAYDEN 14. Permit Status 15. Site Status 16. Facility Type <br />. FA AN AEI <br />5. Zip Code 6. Phone Number <br /> <br />81639 <br />970 <br />276 <br />5217 <br />] 17. OSM Office # 18. CCID # 19. Land Code <br />- <br />( <br />) <br />- 140 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. Stat e Abrev. 22. County Name <br /> <br /> 00 <br />0 CO ROUTT <br />8 <br />Mi <br />Na <br />e 05- <br />3 <br />4 <br /> . <br />ne <br />m <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />SENECA #II <br /> 1 084730 <br />25. Hours 26. Signature Block 27. Revi <br />w <br />iingg Official: <br />2.0 a. Permit Review e <br />. <br />1 <br />W?- <br />b. Site Visit Time <br />12 <br />0 Signature: Si°gnature: <br />. HOWARD STRAND <br /> <br /> <br />Travel Time <br />0 c <br />9 Review Date: 10 /24/ Zo's ti <br />. <br />. Printed Name: mm- dd - yyyy <br />1 5.0 d. Report Writing Date: 10/23/2009 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />h <br />t <br />t <br />d <br />d <br />h <br />l <br />i <br />i <br />i <br />f <br />ave s <br />ar <br />e <br />an <br />w <br />ere coa <br />m <br />n <br />ng operat <br />ons cessation o <br />mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining PI...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase 11 Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />M <br />i <br />Th <br />i <br />S <br />s <br />i <br />f <br />in <br />ng: <br />e Perm <br />t <br />tatus i <br />act <br />ve, site is <br />or the entire permitted area. operations have or are taking place and <br />NM..No <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadin Facility and/or Tipple J... Exempt 16 and 2/3 <br />' <br />s K...Government Financed Construction Exemption <br />C... Preparation Plant G...Stockpge <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of <br />and wish to comment an the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). ReAsedDecembe?4, 1998