My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-30_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2009-11-30_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:17 PM
Creation date
12/1/2009 11:16:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REVISION
Doc Date
11/30/2009
Doc Name
Response to Adequacy Review
From
GCC Energy
To
DRMS
Type & Sequence
TR15
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC GCC Energy, LLC <br />E n e r g y Telephone: 970 385,4528 6473 County Road 120 <br />"Safety as a Value" Facsimile: 970.385.4638 Hesoerus. CO 81326 <br />Please remove the existing contents of Appendix 10 and replace it with the <br />attached Fleming Engineering letter. <br />a. (iii) As mentioned earlier, Scott Fleming, P.E., as part of this response, is <br />providing a new schedule of all project culverts and ditches with calculations <br />performed using the Rational Analysis method rather than SEDCAD. These <br />calculations supersede the culvert and ditch calculations provided by Tom <br />Paluso, P.E. in Appendices 11(2) thru (3). Mr. Fleming has re-worked parts of <br />the Paluso report, leaving Appendix 1 1(1) and (4) intact. Culvert and ditch <br />calculations are now performed by Scott Fleming, P. E. within Appendix 11(2) <br />8a <br />(3). <br />b. Unfortunately, the access roads referred to in this section are part of <br />continuing construction occurring at the bath house/office area and the <br />belt/ return portal area (See photos below). The locations and designs for these <br />roads appear on Maps King II-007 and 007F. At such time that all construction <br />activities are complete in these areas and the roads are constructed to final <br />?_,raclc and desWm, as-built certifications will be provided. <br />16, 2009 <br />6. Post-Mining Contour & Profile Maps <br />a, b. The post-mining contour map and profiles referred to in this section have <br />been prepared and are included as Maps King 11-01 1 A, B &, C. <br />e. Maps King II-010 A, B &, C have not been revised. We intend to submit <br />updated as-built cross sections once final construction grades have been <br />achieved. To aid in calculating a reclamation cost estimate, Map King 1I-010 D <br />has been prepared in AutoCAD Civil 3D to verify reclamation fill volumes for the <br />portal cut areas and the access road to the belt/return portal area.
The URL can be used to link to this page
Your browser does not support the video tag.