Laserfiche WebLink
CIRCES Cost Estimatincl Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 08-Jul-2009 Permit or job no. C-1981-010 Site : Trapper Mine <br />User : JDM Abbreviation : none State :Colorado <br />Task : OOD Filename : C010-00D County :Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :Permit Revison 06 <br />Task description : Summary of Topsoil Replacement, Revegetation, and Micellaneous Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />090 -Replace Topsoil on ASh Dump Pit Area scraperl 8 211.81 $680,231 <br />091 -Replace Topsoil on DIE Pit Area scraperl 8 250.1 $803,376 <br />092 -Replace Topsoil on Z Pit Area scraperl 8 126.01 $404,684 <br />093 -Replace Topsoil on F Pit Area scraper1 8 65.6 $210,741 <br />094 -Replace Topsoil on G Pit Area including K Pit scraper1 8 607.8 $1,952,156 <br />095 -Replace Topsoil on East A Pit Area scraper1 8 110.91 $356,192 <br />096 -Replace Topsoil at West Panel Ponds, BC Roads and Shop scraperl 8 160.2 $514,639 <br />097 -Replace Topsoil at East Panel Ponds and A Road scraperl 8 280.7 $901,523 <br /> <br />100 -Seed DIE Pit Range A-B revege 1 273.3 $176,587 <br />101 -Seed F Pit Range A-B revege 1 55.8 $36,05 <br />4 <br />102 -Seed Z Pit Range A-B revege 1 190.2 1 <br />$122, 894 <br />103 -Seed G Pit Range A-B revege 1 .600.5 $343,635 <br />104 -Seed Ash Dump Range A- revege 1 223.9 $144,668 <br />105 -Seed East A Pit Range A-B revege 1 130.3 $84,191 <br />106 -Seed A Pit Range C-B revege 1 268.3 _ <br />$153,534 <br />107 -Seed H Pit revege 1 207.1 $58,547 <br />108 -Seed Ash Dump Range B revege 1 25.0 $7,067 <br />109 -Seed DIE Pits Range B revege 1 29.6 $8,368 <br /> <br />120 -Seal 16 Boreholes (MR212) borehole 1 64.0 $15,412 <br />121 -Seal 75 Developmental Drill Holes borehole 1 300.0 $72,260 <br />122 -Seal Monitoring Wells borehole 1 162.0 $36,799 <br />130 -Demolish Structures, Remove Materials and Debris demolish <br />1 1 160.0 $1,414,909 <br />131 -Mobilize and Demobilize Equipment mobilize - 4.2 $22, 604 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4,507.6 $8,521,071