Laserfiche WebLink
development in the Preliminary Processing Area and subsequent perpendicular <br />drive through the deposit southwestward. <br />c. Please find revised Exhibit L reflecting Reclamation Plan commitments. The new <br />proposed bond includes the worse case scenario of constructing slope over <br />mine benches. <br />Reclamation Estimate <br />GCC Rio Grande Inc <br />Fremont County <br />Direct Tasks <br />Unit <br />Quantity <br />Cost <br />Total Cost <br />Reconstructing approx 100 feet 3HAV slopes on 15 ft highwall <br />with 50 ft benches every 10 vertical feet <br />Fill material <br />Cy <br />1,020 <br />Loader /truck <br />cy/day c /day <br />4400 <br />$1,954.20 <br />$ <br />453.02 <br />Dozer <br />cy/day c /day <br />2300 <br />$1,539.20 <br />$ <br />682.60 <br />Subtotal <br />$ <br />1,135.62 <br />Placing surface material and <br />manure <br />Loader <br />hours <br />8 <br />$ 188.00 <br />$ <br />1,504.00 <br />Dump truck <br />hours <br />8 <br />$ 188.00 <br />$ <br />1,504.00 <br />Dozer <br />hours <br />8 <br />$ 188.00 <br />$ <br />1,504.00 <br />Subtotal <br />$ 4,512.00 <br />Seeding <br />Drill <br />acres <br />10 <br />$ 75.00 <br />$ <br />750.00 <br />Seed mix <br />acre <br />10 <br />$ 135.00 <br />$ <br />1,350.00 <br />Mulch <br />acre <br />10 <br />$ 55.00 <br />$ <br />550.00 <br />Subtotal <br />$ 2,650.00 <br />Tracking seed and mulch <br />Dozer <br />hours <br />6 <br />$ 188.00 <br />$ <br />1,128.00 <br />Mobilization fee <br />hours <br />2 <br />$ 100.00 <br />$ <br />200.00 <br />Direct Expenses <br />Total <br />$ <br />9,625.62 <br />Indirect Tasks <br />Liability insurance <br />0.0155 <br />$ <br />149.20 <br />Performance bond <br />0.015 <br />$ <br />144.38 <br />Profit <br />0.1 <br />$ <br />962.56 <br />Job Superintendent <br />20 <br />$ 88.00 <br />$ <br />1,760.00 <br />Subtotal <br />$ <br />3,016.14 <br />Miscellaneous indirect <br />0.0925 <br />$ <br />1,169.36 <br />Total Bond <br />$13,811.13 <br />Assumptions <br />1. Reclamation will occur in a maximum of 10 acre phases <br />2. Process area will move onto pit floor in Phase 2 <br />Cn\V /iironrnenLdi I /p \IlterrndLLc ii\4 /es IInc. <br />1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e -mail: eai @bresnan.net <br />Phone: 719 - 275 -8951 • Fax: 719 - 275 -1715 <br />