Laserfiche WebLink
The operator has plans to clean the sediment from pond 8 in the near future. Additional <br />repair work is necessary when equipment is on -site at that time. The short wing ditch leading <br />to the west downdrain on Fill 8 has "short cut" the turn as it enters the main downdrain. <br />Incoming =flow est <br />A short section of the Fill 8 east <br />downdrain at approximately the <br />level of the second terrace from <br />the top has eroded below the <br />riprap lining and requires <br />reconstruction to avoid additional <br />downcutting (shown below). <br />A lengthy ditch above the main portion of Fill 7 has downcut 12 -18 inches along most of its <br />length (at right). <br />