Laserfiche WebLink
for tbne required for topsoilirg page 4 <br />East Petrel Ponds E A Road <br /> Production Adjusted' Fleet <br />Route Route Cubic Rate Production Scraper Fleet Cost Total <br />From To Yards (cydsltu) (cydslhr) Hours Hours ($/hr) ($) <br /> <br />MP2 MP 2,3 376 33.2 4.2 E2,836.65 $ 11,773 <br />H04 West Horse 390 16.0 2.0 $ 2,836.65 $ 5,683 <br />SPS-94 Sage 1,2 361 17.5 2.2 $ 2,836.65 $ 6;213 <br />SP6-94 Sage 1,2 351 34.8 4.4 $ 2,836.65 $ 12,342 <br />G06-DG DPI Guth - = -_: -= 381 12.7 1.6 $ 2,836.65 $ 4,511 <br />A95-2 EP 1 .5^ cg 255 102.8 12.9 $ 2,835.65 $ 36,457 <br />A94-2 EP 2 - - -_ = 148 709.4 88.7 $ 2,836.65 $ 251,530 <br />A97-2 EP 3 228 324.0 40.5 $ 2,836.65 $ 114,900 <br />A96-1 EP 4 215 244.9 30.6 $ 2,836.65 $ 86,853 <br />A98-2 EP 5 229 350.5 43.8 $ 2,836.65 $ 124,277 <br />A92-1 EP 6 - - _-- 54 90 1389.4 173.7 $ 2,836.65 $ 492,672 <br />Total 504,918 156 156 3235.4 404.4 $ 2,836.65 $1 ,147,211 <br />- No visibility correction required for one shift per day operation <br />Sage Ponds topsoil cover depth apprommately 19.5 inchs. Grouse Ponds topsoil cover depth appro>amately 20.5 inchs. <br />• <br />Revision: ?a-c L Y" <br />1-46 Approved: _?2t L?