Laserfiche WebLink
for time required for topsoiling page 3 <br />Ashmore East Pit <br /> Production Adjusted` Fleet <br />Route Route Cubic' Rate Production Scraper Fleet Cost Total <br />From To Yards (cydsRu) (cydsNr) Hours Hours ($Ihr) ($) <br />At-01 AE 1 =. - _ - .- 241 163.8 20.5 $ 2,836.65 $ 58,078 <br />AET-0 AE 2 <br />- " -- <br />142 <br />1205.1 <br />150.6 <br />$ 2,836.65 <br />$ <br />427,319 <br />Total 210,251 154 154 1368.9 171.1 $ 2,836.65 $ 485,398 <br />West Panel Ponds, BC Road and Shop <br />Production Adjusted- Fleet <br />Route Route Cubic Rate Production Scraper Fleet cost Total <br />From To Yards (cydslhr) (cydslhr) Hours Hours ($Ihr) ($) <br />BUZ92-1 Far East Buzzard fiF_ --, __ 435 2.0 0.3 $2,836.65 $ ' 719 <br />CGi Coyote 3E 259 45.9 5.7 $ 2,836.65 $ 16,281 <br />A77-1 Coyote 223 28.7 3.6 $ 2,836.65 $ 10,171 <br />A77-1 WPt 287 14.7 1.8 $ 2,836.65 $ 5,224 <br />MI-12 WP2 5b 138 206.5 25.8 $ 2,836.65 $ 73,234 <br />EMI WP3 . -. - c -' 417 13.1 1.6 $ 2,836.65 $ 4,642 <br />WC1 WP4 -- c -- 216 245.8 30.7 $ 2,836.65 $ 87,150 <br />MH1 WPS 2 262 1042 13.0 $ 2,836.65 $ 36,960 <br />Syt WP6 460 2.0 0.2 $ 2,836.65 $ 694 <br />JGS WP7 121 51.5 6.4 $ 2,836.65 $ 18,257 <br />JG6 WP8 '2 118 112.0 14.0 $ 2,836.65 $ 39,715 <br />A91-8 W P9 <br />128 <br />524.8 - <br />65.6 <br />$ 2,836.65 <br />$ <br />186,071 <br />JG7 WP10 172 98.1 12.3 $ 2,836.65 $ 34,787 <br />JG8 WP11 64 203 63.4 7.9 $ 2,836.65 $ 22,465 <br />H93-2 WP12 273 121.6 15.2 $ 2,836.65 $ 43,114 <br />Total 288,235 176 176 1634.3 204.3 $ 2,836.65 $ 579,495 <br />1 <br />LJ <br />K8V191om P ? <br />1-45 <br />Approvec.